Monday, December 17, 2012

On the 3rd, 4th and 5th day of Christmas.....



On the day of building my pool builder gave to me:
3 burley men
2 Loads of plumbing and rebar
And a guy to remove a tree.


On the day of shotcrete my pool builder gave to me:
4 concrete trucks
3 concrete trowels
2 pairs of cement boots
And a cement pond that was tile free.

On the fifth day of Christmas my pool builder gave to me:
5 feet of electrical wires
4 light niches
3 circuit breakers
2 remote control panels
And an inspector that ignored our plea.

No comments:

Post a Comment