On the day of building my pool builder gave to me:
3 burley men
2 Loads of plumbing and rebar
And a guy to remove a tree.
3 burley men
2 Loads of plumbing and rebar
And a guy to remove a tree.
On the day of shotcrete my pool builder gave to me:
4 concrete trucks
3 concrete trowels
2 pairs of cement boots
And a cement pond that was tile free.
4 concrete trucks
3 concrete trowels
2 pairs of cement boots
And a cement pond that was tile free.
On the fifth day of Christmas my pool builder gave to me:
5 feet of electrical wires
4 light niches
3 circuit breakers
2 remote control panels
And an inspector that ignored our plea.
5 feet of electrical wires
4 light niches
3 circuit breakers
2 remote control panels
And an inspector that ignored our plea.



No comments:
Post a Comment